DENSO
23209-21020
Vezi specificațiile
SolenoidDenso Multi-Point Port Fuel Injection (MPI, 3 bar)Euro 56
DENSO 23209-21020 Injector Combustibil Toyota Prius Yaris Vios Corolla 1.5L 1NZ-FXE Hibrid
COD OE
23250-21020, FJ430, 842-12260SUPAPĂ DE COMANDĂ
-DUZĂ PULVERIZATOR
-PRESIUNE ÎN RAMPĂ
3 barNORMĂ POLUAREEuro 5 / Euro 6
GARANȚIE12 Luni
03
Specificații tehnice
| Specificație | Valoare |
|---|---|
| Cod SKU | 23209-21020 |
| Marcă | DENSO |
| manufacturer_code | 23209-21020 |
| pressure_rating | 3.0 bar (43.5 psi) |
| torque_flange | 21 N-m (15 lb-ft) |
| torque_line | 21 N-m (15 lb-ft) |
| engine_family | Toyota 1.5L 4-Cylinder DOHC 16V VVT-i Hybrid (1NZ-FXE / 1NZ-FE) |
| Presiune de lucruSpecificație de bază |
04
Coduri de Eroare (DTC) si Protocoale de Diagnostic
Coduri comune de eroare de diagnosticare (DTC) declansate atunci cand acest injector common rail sufera uzura, defectiuni de circuit sau abateri:
P0087Critical
Fuel Rail / System Pressure Too Low
Excessive internal backleak from worn control valve seats drops common rail pressure below target under engine load.
P0201 - P0208High
Injector Circuit Malfunction / Open Circuit
Solenoid coil resistance drift (0.2-0.5 Ω) or piezo stack degradation triggers driver stage shutdown on affected cylinders.
P0300 / P0301+High
Cylinder Misfire & Balancing Deviation
Carbon-clogged nozzle spray holes or missing IMA calibration causes uneven cylinder contribution. Recode ECM and verify washer seating.
P0088High
Fuel Rail / System Pressure Too High
Spill line backpressure or stuck metering valve prevents rail depressurization, creating overpressure risks under load.
PROTOCOALE DE ATELIER
Protocoale Tehnice de Diagnosticare & Service
Proceduri verificate de atelier, praguri de testare și standarde de intervenție pentru acest ansamblu.
Protocol de Diagnoză în Atelier
Citește protocolul tehnicTestul Debitului de Retur la Injectoare: Valori și Diagnoză
SOP ATELIER DIESEL COMMON RAIL
Citește protocolul tehnicExtragere Injectoare Blocate & Decalaminare | FuelPartsDB
PROTOCOL DE ASAMBLARE ȘI INSTALARE
Citește protocolul tehnic